Assess algae, dirt, grease and chalking paint particles can impair adhesion. Cleaning and other preparation should follow the chosen paint system and the condition of the surface.
Preparation must leave a sound surface that suits the new coating. Assess contamination, loose material and moisture, and follow the cleaning and paint manufacturers’ instructions. Fresh render may have its own curing and preparation requirements.
Moisture exposure is high in north-west Skåne, around Kvidinge, Åstorp and Klippan. The proximity of Skälderviken and Öresund brings damp air that feeds green algae and black mould on north-facing and shaded walls. We therefore often see heavy growth on façades facing woodland or large trees.
Appropriate cleaning removes specified contamination and can make surface damage easier to inspect. It does not replace scraping, repairs or a moisture assessment where these are needed. The related work is described under façade renovation and painting.
Cleaning, scraping, filling and priming are planned according to the condition of the surface and the chosen paint system. Choose preparation from the surface condition and the paint system. Do not assume that washing alone establishes a sound, dry surface or that every fresh render system needs the same treatment.






