Kvidinge Church’s bell tower is documented in NLL’s project photographs, including work from scaffolding. The surface and existing treatment determine the required preparation.
Project at a glance
- Painting work from scaffolding —the entire tower, all four sides, top to bottom
- Cleaning and drying requirements depend on the existing surface and selected treatment
- Freestanding buildings wear more evenly —but more heavily; there is no sheltered side
- Work proceeded top to bottom —so nothing ran onto finished surfaces
How great is the before-and-after difference?
The photographs show the bell tower during the project. What looks like dirt on the left is algae established in the joints between boards.

What would repainting like this cost at your property?
Area, timber condition and preparation determine the price. Calculate a range for your own house below.
Estimate your cost
Enter the scope for an estimated range including VAT. Any illustration after a 30% ROT deduction applies only to qualifying labour and assumes the customer meets all conditions and has sufficient tax capacity and remaining allowance. Materials are excluded.
How did the work proceed, step by step?
Sequence matters more on a freestanding timber building than an ordinary house because all work is from scaffolding and returning is not easy.
- Scaffolding around the whole towerAccess and scaffolding must be planned for the particular building, work and drying requirements.
- Washing downAlgae and dirt are removed, especially from board joints where they cling most firmly.
- DryingTimber dries before treatment. Treating damp timber traps moisture rather than protecting against it.
- Treatment from top to bottomSo nothing runs over an already finished surface.
- Inspection before scaffold removalThe final chance to reach high areas without rebuilding everything.
Why does a freestanding bell tower wear differently?
A freestanding timber structure can be exposed on several sides. Inspect each elevation and its details separately; exposure alone does not establish the degree or distribution of wear.
This is clearest at joints. Water running down cladding remains where boards meet, allowing algae to establish. We therefore spend more time washing and drying this building than a same-sized house façade.
Church buildings also have a requirement absent from house projects: work must not disrupt activities. We planned around the parish schedule.
Which services were included?
Does your association or parish have a building needing attention? Call 076-227 97 68 or request a quote —we visit and inspect before setting the price.
