NLL’s Arild reference project documents painting of timber cladding, woodwork and a glazed veranda. Narrow glazing bars and trim require their own preparation and application scope.
Project at a glance
- Timber cladding, woodwork and veranda painting, documented in project photographs
- The veranda determined the schedule — glazing bars and trim are measured in linear metres, not square metres
- Loose paint scraped away — new paint over loose old paint detaches with it
- Coastal exposure raises demands — salt and westerly wind wear south and west sides faster
What did the work look like on site?
What would timber façade painting like this cost at your home?
Area, cladding condition and scraping required determine the price. Calculate a range for your own house below.
Estimate your cost
Enter the scope for an estimated range including VAT. Any illustration after a 30% ROT deduction applies only to qualifying labour and assumes the customer meets all conditions and has sufficient tax capacity and remaining allowance. Materials are excluded.
How did the work proceed, step by step?
Preparation and application depend on the timber’s condition, existing coating and selected paint system. The following stages describe the types of work that may be needed.
- WashingThe entire façade is washed so dirt and algae are not trapped beneath new paint.
- Scraping: remove loose paint and assess the remaining surface before applying a compatible coating.
- Priming bare timberExposed timber is primed before topcoat; otherwise uneven absorption leaves a patchy finish.
- Two coats on the claddingLarge areas first, with drying between coats.
- Woodwork and veranda by handGlazing bars, trim and surrounds are painted with a narrow brush: this takes longest relative to area.
Why does a glazed veranda take longer than cladding?
A clad wall can be painted in long strokes. A glazed veranda instead consists of glazing bars, trim and surrounds: narrow surfaces measured in linear rather than square metres, with every edge kept straight against glass.
The veranda also faces coastal weather in Arild. Salt and westerly wind wear south and west sides faster than the rest, so these needed most scraping before priming.
How often does a timber façade need repainting?
Inspect each side of a timber house separately. Sun, rain, shade, existing coatings and construction details can affect wear differently; one wall’s condition does not establish the condition of the rest.
At a coastal property in Arild, assess exposure alongside the surface and existing coating. The required treatment depends on the actual condition.
The practical advice is simple: walk around annually and feel by hand. If paint is firmly attached and even, nothing is needed. If it chalks onto your palm or bare timber shows at joints and end grain, it is time; repainting is then cheaper than first replacing cladding.
What was excluded?
The Arild project documents painting of the timber façade. Cladding replacement is a separate service with its own assessment of timber condition, underlying construction and scope.
The roof and metal details were also untouched. We can do these while scaffolding is up, but only if the customer wants; they should not be slipped into a quote.
Which services were included?
Is your timber house starting to peel? Call 076-227 97 68 or request a quote —we inspect the cladding before setting the price.
Photos from work in Arild
These photographs were taken on site during work between 31 March and 10 June 2026. Dates come from the images’ EXIF information.