We count visits to see which pages are helpful – nothing is sold on. Privacy policy

NLL Prices

How much does it cost to paint the outside of a house?

Dorde Lalic, founder and owner of NLL MåleriDorde Lalic founder and ownerNLL Måleri · 6 min readLinkedIn

Updated

Scaffolding in front of the gable of a red-painted timber house in Lycke.

Quick answer

For 100 m² of timber facade, NLL Måleri’s estimated labour, paint, tape and protection cost is SEK 81,250–112,500 including VAT, before any ROT deduction. Scaffolding, repairs, travel and other extras are outside this example. The final price depends on the paintable area, its condition and the work agreed in the quote.

  • Calculate the paintable area, not the floor area.
  • Separate labour and materials from other extras.
  • ROT applies only to eligible labour when the conditions are met.

Start with the facade you want painted, rather than the house’s living area. A home with 100 m² of floor space may have a different facade area because of its height, gables and included details.

Estimate your project cost

Select the service, scope and customer type. The calculator loads here.

Request a quote

Price per m²: labour, materials and extras

NLL’s timber-facade rates are SEK 625–875/m² for labour and SEK 187.50–250/m² for paint, tape and protection. These figures include VAT and are before any ROT deduction. The labour rate for render or brick is SEK 500–750/m², with the same stated materials range used in the calculation.

NLL rates per m² of paintable facade, including VAT before any ROT deduction. Scaffolding, repairs, travel and other extras are excluded.
SurfaceLabourPaint, tape and protectionTotal for these items
Timber facadeSEK 625–875/m²SEK 187.50–250/m²SEK 812.50–1,125/m²
Rendered facadeSEK 500–750/m²SEK 187.50–250/m²SEK 687.50–1,000/m²
Brick facadeSEK 500–750/m²SEK 187.50–250/m²SEK 687.50–1,000/m²

The table is a painting budget guide. It does not give an all-inclusive price for every house or cover structural facade renovation. Ask NLL to specify the preparation, products and extras assessed for your facade.

Are windows, doors and roofs included?

Windows, doors and roofs are not automatically priced as facade area. List corner boards, surrounds, bargeboards, garages and any other parts you want included. This helps you compare quotes for the same work.

How do you define cladding replacement?

Cladding replacement needs its own quantity and price item. Mark the areas to assess for replacement separately from those to be painted. The guide to replacing or painting timber cladding helps you define that scope.

A timber-clad gable above a yellow brick facade, with scaffolding in front of the house.
The timber cladding and brick wall are separate surfaces. The quote needs to identify the surfaces and details to be treated, even when they are on the same house.

Cost is one part of the job. The guide to repainting a house exterior connects the assessment, paint choice, preparation and request for a quote.

Measure the facade, not the living area

Add the paintable area of each facade side and record openings and details separately. A simple measured sketch helps you check that your budget and the quote cover the same surfaces.

How do you calculate wall and gable areas?

  1. Calculate walls: width × height for each rectangular surface.
  2. Add gables: base × height ÷ 2 for each triangular surface.
  3. Record openings: window and door dimensions, plus areas to remain unpainted.
  4. Confirm the quantity: ask NLL which paintable area and details are used in the quote.
Worked facade-area example with a rectangular wall and triangular gable.
Illustration: a 10 × 3 metre wall is 30 m². A gable with a 10 metre base and 2 metre height is 10 m². Together they total 40 m² gross, before any agreed deductions for openings.

Should windows and doors be deducted?

This budget does not apply an assumed deduction for windows and doors. Record them separately and agree the measurement method with NLL. A smaller painted area can still include details that need a separate price.

Worked example: 100 m² of timber facade

Labour and the stated painting materials for 100 m² of timber facade total SEK 81,250–112,500 including VAT, before any ROT deduction. This uses exactly 100 m² of paintable facade and NLL’s rate ranges in the table above.

100 m² of timber facade. All figures include VAT; scaffolding, repairs, travel and other extras are outside the example.
ItemCalculationAmount before ROT
Labour100 m² × SEK 625–875/m²SEK 62,500–87,500
Paint, tape and protection100 m² × SEK 187.50–250/m²SEK 18,750–25,000
Total for these itemsLabour + stated materialsSEK 81,250–112,500

What is the equivalent cost for render or brick?

For 100 m² of render or brick, the equivalent total is SEK 68,750–100,000 including VAT before any ROT deduction. It also covers labour and the stated painting materials, excluding scaffolding, repairs, travel and extras. New render and structural facade repairs are not included.

This is a calculation, rather than a quote or a documented customer project. If you are considering doing the painting yourself, budget for your own purchases, equipment and time. Compare the items in painting yourself or hiring a painter.

What the quote needs to specify

The quote needs to identify the surfaces, preparation, paint system and extras covered by the agreed price. Ask for these details before comparing totals:

  • Surfaces and details: facade sides, gables, corner boards, surrounds and explicit exclusions.
  • Preparation: cleaning, loose-paint removal, repairs and priming assessed for the facade.
  • Paint system: named products and the surfaces they will be used on.
  • Access and other costs: scaffolding, transport, travel and other separately agreed items.
  • Price and changes: pricing basis, VAT, extras and how additional work is approved.

For homeowners hiring a contractor privately, Konsumentverket recommends putting the price, work and completion arrangements in writing. A written scope makes it easier to see what each quote covers.

Ask why the proposed products suit the facade material and its existing coating. The guide to choosing paint for your house helps you prepare those questions.

How does timing affect the plan?

The schedule needs to fit the house and the specified treatment. Preparation and weather conditions need to be addressed; this guide promises no fixed number of working days. See when facades can be painted in Skåne. If you plan a colour change, use the guide to planning permission for house painting.

ROT deductions apply to eligible labour

ROT can reduce eligible labour costs by up to 30%. The customer, property and work must meet the conditions, with sufficient tax and remaining allowance. Materials, travel and equipment do not qualify. Check Skatteverket’s ROT conditions before using an after-ROT figure in your budget.

Conditional example for 100 m² of timber facade, including VAT. All labour is assumed eligible for 30% ROT, with sufficient tax and remaining allowance.
ItemLower end of rangeUpper end of range
Labour before ROTSEK 62,500SEK 87,500
Conditional ROT deduction−SEK 18,750−SEK 26,250
Labour after deduction + stated materials43,750 + 18,750 = SEK 62,50061,250 + 25,000 = SEK 86,250

The conditional total is SEK 62,500–86,250 for labour and the stated materials. Scaffolding, repairs, travel and other extras remain excluded. If you cannot use the full deduction, the amount payable is higher.

Labour, material and extra cost categories, with possible ROT applied only to eligible labour.
Illustration: keep labour separate from materials and other costs. ROT is calculated only on eligible labour and remains conditional under Skatteverket’s rules.

Get a price for your house

Send NLL the address, approximate facade area, photographs and requested work for assessment. Include every relevant side, any known previous paint treatment and access restrictions. Identify measurements or repairs that still need checking.

Read what NLL’s facade painting in north-west Skåne covers, compare your items in the project cost calculator and send the details for a quote. The calculation supports your budget; the agreed quote defines the work and price for your house.

Sources and scope

Product requirements, exceptions and conditions accompany the relevant answers.

Planning to repaint?

Request a fixed price

Estimate your project cost